Building work on the new No.3 Court remains on schedule, with the outer structure of the stadium now largely complete. Construction has been continuing since the end of the 2009 Championships, with the 2,000 seater stadium – built over the old Court 2 and Court 3 - ready for the 2011 Championships http://blog.wimbledon.org/2010/03/26/the-new-court-3/