Paperwork proliferated. Cost-cutting efforts backfired. Managers skimped on purchases of everything from earplugs to spare motors and scaled back routine maintenance. Machines began to break down more often, and with parts no longer in stock a replacement could take days to arrive.

Labor costs spiked as managers revamped work schedules with little understanding of how the plant actually operated. Linson says he picked up an entire shift of overtime each week because his managers didn't realize that a furnace needed a full eight hours to heat up to operating temperature.

"That didn't work to their advantage," he said. "I made a lot of money."

Daily life at the plant was also growing more dangerous. Veteran crane operator Ed Mossman says he was ordered to pick up a load of steel that was 50 percent above the recommended weight limit - a prospect that could have toppled the crane and sent Mossman plunging to his death. When he refused, he says, he was fired after putting in 29 years at the mill.
orison is offline


 

All times are GMT +1. The time now is 07:28 AM.
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Design & Developed by Amodity.com
Copyright© Amodity