View Single Post
Old 03-02-2009, 09:35 AM   #19
mobiphones

Join Date
Oct 2005
Posts
546
Senior Member
Default
for new shinai,
1) lightly sand edges.
2) use damp rag to wipe down and dust from sanding.
3) use mineral oil to soak each slat good.
4) let sit for a day
5) use Vasoline rag on each slat
6) reassemble then place in plastic bag for another day.

Regular use; after practice
1) inspect for splintering.
2) wipe with damp rag
3) put in plastic bag for night

it's really dry in san diego
mobiphones is offline


 

All times are GMT +1. The time now is 06:39 PM.
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Design & Developed by Amodity.com
Copyright© Amodity