LOGO
Reply to Thread New Thread
Old 04-12-2012, 05:36 PM   #1
pseusawbappem

Join Date
Oct 2005
Posts
472
Senior Member
Default Access track made on avalanche
RAWALPINDI: Despite weather hazards, rescue operation at Gayari Sector continues at five priority points identified with the help of SPD team employed along with plant equipment, Army Search and Rescue Teams.

According to ISPR, a 450 meters long access track has been developed on the avalanche to access the priority points. Work on another access track has also been started to widen search perimeter.

Mainly the plant equipment is employed at two points where work is in progress at rapid speed.

At the work on other three points mainly being done with the help of infantry troops who resort to manual digging with some assistance from plant equipment where required.

A Dozer has been employed to restore the water channel, which has been blocked due to avalanche. So far two exists are available with 20 and 15 cusecs discharge. Efforts are in hand to enhance the same with the help of plant equipment.


pseusawbappem is offline



Reply to Thread New Thread

« Previous Thread | Next Thread »

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

All times are GMT +1. The time now is 10:30 AM.
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2
Design & Developed by Amodity.com
Copyright© Amodity